Supporting bracket of main water supply pipe of Water Supplies Department

Feb 05, 2026 Leave a message

Project Background: Prefabrication of load-bearing supports for the main water supply pipeline of the Water Supplies Department. The supports are made of 160×160 mm H-beam steel, designed to meet both aesthetic and functional requirements.ct1

Core Solution: The main material is fabricated using stainless steel plates through non-standard welding, which involves substantial welding workload. It is necessary to consider welding deformation control and subsequent correction.

112

Results and Implications: Successful final delivery with deformation control within 2mm, perfect installation, and guaranteed 100% RT inspection pass rate for welds

info-674-300

 

info-239-529