Library Decoration Component Installation Positioning Bracket

Feb 05, 2026 Leave a message

Project Background: The project involves installing positioning brackets for library decorative components, requiring full penetration welding to meet third-party inspection requirements.

123

Core Solution: The main material consists of 316 stainless steel plates welded to round rods. Prior to welding, the rods undergo chamfering and turning, followed by argon arc welding.

3

 

9

Results and Implications: Third-party inspection was conducted after welding completion, with the results indicating RT compliance. 

7